{"user":{"authenticated":false,"username":"anonymous","displayName":"Guest","globalRole":"guest"},"projects":[{"id":"bridge-ops","slug":"bridge-ops","name":"Bridge Ops","themeLabel":"Bridge Deck","status":"planned","interactionMode":"hybrid","responsibleAgent":"Hub","summary":"Bridge runbook workspace kept locked until a mission activates project access.","projectRole":null,"accessible":false},{"id":"mission-board","slug":"mission-board","name":"Mission Board","themeLabel":"Guild Board","status":"active","interactionMode":"ui","responsibleAgent":"Hub","summary":"Project discovery, access activation, and mission routing surface for the Hub.","projectRole":null,"accessible":false},{"id":"shopping-ops","slug":"shopping-ops","name":"Shopping Operations","themeLabel":"Provision Ledger","status":"active","interactionMode":"hybrid","responsibleAgent":"Kali","summary":"Hybrid shopping list and inventory workflow for the pre-MVP.","projectRole":null,"accessible":false}]}